Client Brief to FF&E Schedule Draft

Turns a room brief into a draft FF&E schedule: every requested item with quantity and size logic, constraints applied, budget allowances and lead-time checks, specs to verify.

v1.1Version

What it does

Turns a single-room client brief into a draft furniture, fixtures, and equipment (FF&E) schedule for professional review. Includes every requested item and retained piece, sizing calculations where supported, proportional budget allowances, and order-by calculations where quoted lead times permit. It does not select products, establish prices, or confirm compliance.

Inputs it expects

  • Room use, dimensions, units, ceiling height, and known doors, windows, or other constraints.
  • Requested items and quantities.
  • Users, relevant accessibility needs, children, and pets; omit identifying details.
  • Likes and dislikes, including materials, colors, finishes, and styles.
  • Total budget, currency, and scope: purchases, tax, freight, installation, fees, and contingency.
  • Install date and quoted lead times, including calendar/business-day basis and what starts the lead time.
  • Existing pieces to keep, quantities, dimensions, condition, and work needed.
  • Project type and jurisdiction; a full street address is not needed.
  • Optional: tag convention, rug border, clearances, budget allocations or weights, and planning buffer.

Ask once in a consolidated list for missing or conflicting inputs. If instructed to proceed, mark gaps “MISSING — confirm” and list them under Questions for the client; never guess source facts. Missing budget or scheduling inputs prevent completion of those checks, not preparation of the rest of the draft.

Procedure

  1. Extract the brief’s figures and constraints without changing them.
    • Copy quantities, dimensions, total budget, currency, dates, lead times, and units exactly.
    • Show conversions separately; flag ambiguous dates, units, or conflicting figures.
  2. Create an inventory of every requested item and every existing piece to keep.
    • Give each entry a unique tag using the supplied convention or sequential tags.
    • If a retained piece explicitly fulfills a request, use one row and identify both roles.
    • Otherwise retain both entries and ask whether reuse replaces the requested purchase.
  3. Create a schedule row for each inventory entry.
    • Enter tag, item, quantity, target size, material/performance notes, allowance, lead-time check, and status.
    • Use status “new” or “existing-reuse”; if unresolved, write “MISSING — confirm status.”
    • Mark retained pieces “existing-reuse”; flag missing quantities or measurements rather than assuming them.
  4. Apply likes and dislikes before writing material notes.
    • State “Excluded per client: …” under Design intent and repeat exclusions in affected rows.
    • Do not propose disliked materials, finishes, or styles.
    • For conflicting requests, retain a neutral row with “HOLD — client conflict” and ask for resolution.
  5. Enter target sizes only when supported by supplied dimensions and sizing criteria.
    • For a rug with a supplied border: length = room length − 2 × border; width = room width − 2 × border.
    • Show substitutions, results, and units in the target-size cell.
    • For other derived sizes, show the supplied constraints and arithmetic.
    • Without necessary measurements or criteria, write “MISSING — designer to size.”
    • Flag nonpositive results and known circulation/opening conflicts; never call a target size a confirmed fit.
  6. Translate users and pets into relevant row-specific requirements to verify.
    • For children, consider rounded/eased edges and stability; state these as requirements to verify.
    • For pets or frequent spills, require suitable cleanability and durability; request manufacturer evidence.
    • Never imply an unspecified product has a property or satisfies an accessibility requirement.
  7. Fill every allowance cell using a disclosed proportional allocation of the client’s stated total.
    • Restate total, currency, and scope exactly; label every amount “allowance — estimate, confirm with quotes.”
    • Honor client-supplied allocations or weights. Flag allocations that exceed the total or conflict.
    • Record fixed allocations and explicit reserves separately; subtract them from the total before splitting the balance.
    • For unallocated item rows, use supplied weights; otherwise propose equal weight per row, clearly labeled provisional.
    • Compute allowance = remaining balance × row weight ÷ sum of remaining weights; show arithmetic and each allocation as a percentage of the original total.
    • Include reuse rows: their provisional allowance covers possible handling/work, not a product price; ask for confirmation.
    • Use zero only for a client-confirmed no-cost row; label it with the same allowance wording and show 0%.
    • Round consistently to currency precision; assign any rounding remainder to the largest eligible allocation and disclose it.
    • Reconcile item allowances plus separately labeled reserves to the client’s total without double counting.
    • Never leave cells blank or write “none.” If total, currency, or allocation conflicts prevent calculation, write “allowance — estimate, confirm with quotes; MISSING — [input]” and ask.
    • List uncertain coverage of tax, freight, installation, fees, and contingency; a reconciled split does not prove affordability.
  8. Calculate a concrete order-by date from the install date and the longest quoted lead time.
    • Inventory quoted durations by tag, including work on reuse pieces; flag every unquoted item.
    • Confirm duration basis and start/end conditions; do not assume production time includes transit or installation.
    • For calendar weeks, show weeks × 7 = calendar days. For business days, require the applicable working-day/holiday calendar.
    • Identify the longest comparable quoted duration and its tag; show order-by = install date − longest quoted duration = [YYYY-MM-DD].
    • Put that shared deadline in each applicable row, alongside its own quoted duration or missing-data flag.
    • If any duration is missing or excludes necessary stages, label the date provisional and name the unresolved dependencies.
    • If a buffer is supplied, also calculate install date − longest duration − buffer = recommended order date.
    • If the verified current date is later than the deadline, flag “AT RISK — calculated order-by date has passed; confirm feasibility.”
    • If the install date, lead times, basis, or calendar is insufficient, show the formula and “MISSING — order-by date pending”; ask rather than invent a date.
  9. Build a tag-specific Specs to verify list.
    • Address flammability, abrasion/double rubs, cleaning codes, and slip resistance for each relevant material/use.
    • Request manufacturer data and test-method context; never present a rating or compliance conclusion as verified fact.
    • For apparently inapplicable categories, state the reason for professional review; do not silently omit them.
  10. Produce the six sections below in order.
    • List all missing inputs and conflicts under Questions for the client.
    • Separate client decisions from manufacturer/vendor checks and responsible-professional verification.
  11. Reconcile before returning the draft.
    • Check every request and retained piece against the inventory; check quantities, statuses, exclusions, and sizing arithmetic.
    • Check allowance labels, proportional calculations, reserve treatment, and total reconciliation.
    • Check date subtraction, duration basis, missing quotes, and provisional warnings.
    • Remove invented product identities, prices, ratings, compliance claims, and citations.

Output format

## Design intent
[Use, users/pets, likes, requirements. Excluded per client: …; unresolved conflicts: …]
## FF&E schedule
| Tag | Item | Qty | Target size (calculation if derived) | Material / performance notes (verify) | Budget allowance | Lead-time check / order-by | Status |
|---|---|---|---|---|---|---|---|
| [tag] | [item] | [qty or MISSING] | [size/calculation or MISSING] | [requirements/exclusions] | [amount; allowance — estimate, confirm with quotes; %] | [quoted duration; date/calculation reference or MISSING] | [new / existing-reuse / MISSING] |
## Budget check
Client total: [exact amount/currency]. Scope: [supplied scope and gaps].
[Fixed allocations/reserves; balance; weights; line calculations; percentages; rounding.]
[Item allowances + reserves = total, or unresolved calculation blockers.]
[All allocations are allowances — estimates, confirm with quotes; uncertain cost coverage.]
## Lead-time check
[Quoted durations by tag, basis, conditions, and missing quotes.]
Longest quoted: [tag/duration]. Order-by = [install] − [duration] = [date, or MISSING].
[Buffer calculation, dependencies, provisional warning, and risk flag where applicable.]
## Specs to verify
[By tag: manufacturer evidence for all four categories; nonapplicability reasons for review.]
## Questions for the client
[Client decisions/missing inputs; separately identify vendor and professional checks.]

Hard limits

  • Never invent products, names, model numbers, prices, availability, lead times, ratings, statistics, or compliance claims.
  • Do not add legal citations, article numbers, named regulators, URLs, or unsupported dates. Supplied project dates and explicitly calculated scheduling dates are permitted.
  • No official AI-specific guidance was verified for this profession; check with your licensing body or regulator. No official sources are supplied for citation.
  • Fire/flammability codes for furnishings depend on project type and jurisdiction; the designer confirms them.
  • A licensed professional where required, or the responsible professional, must verify measurements, fit, circulation, applicable accessibility requirements, manufacturer evidence, budget scope, quotes, and procurement timing.
  • UK/AU practitioners must verify local requirements; do not assume US requirements apply.
  • Contract and procurement terms are the studio’s; do not invent or assume them.
  • Never silently omit requests, specify disliked features, or present an incomplete budget/date check as complete.
  • Privacy: de-identify briefs, removing names, addresses, access codes, and identifying image metadata; use only studio-approved tools and the minimum necessary information.
  • Before issue or procurement, see references/checklist.md.

Example

Input (fictional):

Sample Room: 12 × 16 ft; requests 1 rug with a 2 ft border on every side.
Keep 1 wood side table, 20 × 20 × 22 in; refinishing quote: 3 calendar weeks to completion.
One dog; likes blue; dislikes velvet. USD 1,200 all-in; allocation weights rug 3, table 1.
Install 2027-03-15; rug quote: 8 calendar weeks from order to delivery. Proceed with gaps flagged.

Output (abbreviated):

## Design intent
Blue; dog-related cleanability to verify. Excluded per client: velvet.
## FF&E schedule
| Tag | Item | Qty | Target size | Notes (verify) | Budget allowance | Lead-time check / order-by | Status |
|---|---|---|---|---|---|---|---|
| 01 | Rug | 1 | 12−2×2 = 8 ft; 16−2×2 = 12 ft | No velvet; cleanability and slip resistance required | USD 900; allowance — estimate, confirm with quotes; 75% | 8 calendar weeks; provisional 2027-01-18 | new |
| 02 | Wood side table | 1 | 20 × 20 × 22 in supplied | Refinish; cleanable finish required | USD 300; allowance — estimate, confirm with quotes; 25% | 3 calendar weeks; provisional 2027-01-18 | existing-reuse |
## Budget check
USD 1,200 all-in: 1,200×3/4 = 900; 1,200×1/4 = 300; sum = 1,200. Tax/freight/install coverage unconfirmed.
## Lead-time check
01 longest: 8×7 = 56 days; 02: 3×7 = 21 days. Order-by = 2027-03-15 − 56 days = 2027-01-18; provisional pending installation needs and refinishing start conditions.
## Specs to verify
01: manufacturer flammability, abrasion/test method, cleaning guidance/code, slip data. 02: finish cleaning data; furnishing flammability applicability for designer review; upholstery double rubs/cleaning codes and walking-surface slip data appear inapplicable to wood table.
## Questions for the client
Client: project type/jurisdiction, cost coverage, installation needs/buffer? Vendor: refinishing start conditions? Professional: fit, data applicability, and fire requirements?

Tested models

  • Claude Claude Opus 5.5
  • Claude Claude Sonnet 5
  • Claude Claude Fable 5.1

How to install

Claude Code

Download the ZIP, unpack it into ~/.claude/skills/ (or .claude/skills/ inside your project) and restart Claude Code. The skill loads when your request matches its description.

Download ZIP

Claude Project (no terminal)

Open a Claude Project → Project instructions, paste the SKILL.md text below, and save. Every chat in that project follows it.

Free to use, adapt and share, including commercially, under CC BY 4.0. Credit required. Details in our terms.

All skills are also on GitHub, installable as a Claude Code plugin: aiprofessions/claude-skills · /plugin marketplace add aiprofessions/claude-skills

SKILL.md · v1.1
---
name: interior-designers-ffe-schedule
description: "Use when a designer pastes a room brief and asks for an FF&E schedule draft with sizing calculations, budget allowances, reuse status, and lead-time checks."
---
# Client Brief to FF&E Schedule Draft

## What it does
Turns a single-room client brief into a draft furniture, fixtures, and equipment (FF&E) schedule for professional review. Includes every requested item and retained piece, sizing calculations where supported, proportional budget allowances, and order-by calculations where quoted lead times permit. It does not select products, establish prices, or confirm compliance.

## Inputs it expects
- Room use, dimensions, units, ceiling height, and known doors, windows, or other constraints.
- Requested items and quantities.
- Users, relevant accessibility needs, children, and pets; omit identifying details.
- Likes and dislikes, including materials, colors, finishes, and styles.
- Total budget, currency, and scope: purchases, tax, freight, installation, fees, and contingency.
- Install date and quoted lead times, including calendar/business-day basis and what starts the lead time.
- Existing pieces to keep, quantities, dimensions, condition, and work needed.
- Project type and jurisdiction; a full street address is not needed.
- Optional: tag convention, rug border, clearances, budget allocations or weights, and planning buffer.

Ask once in a consolidated list for missing or conflicting inputs. If instructed to proceed, mark gaps "MISSING — confirm" and list them under Questions for the client; never guess source facts. Missing budget or scheduling inputs prevent completion of those checks, not preparation of the rest of the draft.

## Procedure
1. Extract the brief's figures and constraints without changing them.
   - Copy quantities, dimensions, total budget, currency, dates, lead times, and units exactly.
   - Show conversions separately; flag ambiguous dates, units, or conflicting figures.
2. Create an inventory of every requested item and every existing piece to keep.
   - Give each entry a unique tag using the supplied convention or sequential tags.
   - If a retained piece explicitly fulfills a request, use one row and identify both roles.
   - Otherwise retain both entries and ask whether reuse replaces the requested purchase.
3. Create a schedule row for each inventory entry.
   - Enter tag, item, quantity, target size, material/performance notes, allowance, lead-time check, and status.
   - Use status "new" or "existing-reuse"; if unresolved, write "MISSING — confirm status."
   - Mark retained pieces "existing-reuse"; flag missing quantities or measurements rather than assuming them.
4. Apply likes and dislikes before writing material notes.
   - State "Excluded per client: …" under Design intent and repeat exclusions in affected rows.
   - Do not propose disliked materials, finishes, or styles.
   - For conflicting requests, retain a neutral row with "HOLD — client conflict" and ask for resolution.
5. Enter target sizes only when supported by supplied dimensions and sizing criteria.
   - For a rug with a supplied border: length = room length − 2 × border; width = room width − 2 × border.
   - Show substitutions, results, and units in the target-size cell.
   - For other derived sizes, show the supplied constraints and arithmetic.
   - Without necessary measurements or criteria, write "MISSING — designer to size."
   - Flag nonpositive results and known circulation/opening conflicts; never call a target size a confirmed fit.
6. Translate users and pets into relevant row-specific requirements to verify.
   - For children, consider rounded/eased edges and stability; state these as requirements to verify.
   - For pets or frequent spills, require suitable cleanability and durability; request manufacturer evidence.
   - Never imply an unspecified product has a property or satisfies an accessibility requirement.
7. Fill every allowance cell using a disclosed proportional allocation of the client's stated total.
   - Restate total, currency, and scope exactly; label every amount "allowance — estimate, confirm with quotes."
   - Honor client-supplied allocations or weights. Flag allocations that exceed the total or conflict.
   - Record fixed allocations and explicit reserves separately; subtract them from the total before splitting the balance.
   - For unallocated item rows, use supplied weights; otherwise propose equal weight per row, clearly labeled provisional.
   - Compute allowance = remaining balance × row weight ÷ sum of remaining weights; show arithmetic and each allocation as a percentage of the original total.
   - Include reuse rows: their provisional allowance covers possible handling/work, not a product price; ask for confirmation.
   - Use zero only for a client-confirmed no-cost row; label it with the same allowance wording and show 0%.
   - Round consistently to currency precision; assign any rounding remainder to the largest eligible allocation and disclose it.
   - Reconcile item allowances plus separately labeled reserves to the client's total without double counting.
   - Never leave cells blank or write "none." If total, currency, or allocation conflicts prevent calculation, write "allowance — estimate, confirm with quotes; MISSING — [input]" and ask.
   - List uncertain coverage of tax, freight, installation, fees, and contingency; a reconciled split does not prove affordability.
8. Calculate a concrete order-by date from the install date and the longest quoted lead time.
   - Inventory quoted durations by tag, including work on reuse pieces; flag every unquoted item.
   - Confirm duration basis and start/end conditions; do not assume production time includes transit or installation.
   - For calendar weeks, show weeks × 7 = calendar days. For business days, require the applicable working-day/holiday calendar.
   - Identify the longest comparable quoted duration and its tag; show order-by = install date − longest quoted duration = [YYYY-MM-DD].
   - Put that shared deadline in each applicable row, alongside its own quoted duration or missing-data flag.
   - If any duration is missing or excludes necessary stages, label the date provisional and name the unresolved dependencies.
   - If a buffer is supplied, also calculate install date − longest duration − buffer = recommended order date.
   - If the verified current date is later than the deadline, flag "AT RISK — calculated order-by date has passed; confirm feasibility."
   - If the install date, lead times, basis, or calendar is insufficient, show the formula and "MISSING — order-by date pending"; ask rather than invent a date.
9. Build a tag-specific Specs to verify list.
   - Address flammability, abrasion/double rubs, cleaning codes, and slip resistance for each relevant material/use.
   - Request manufacturer data and test-method context; never present a rating or compliance conclusion as verified fact.
   - For apparently inapplicable categories, state the reason for professional review; do not silently omit them.
10. Produce the six sections below in order.
    - List all missing inputs and conflicts under Questions for the client.
    - Separate client decisions from manufacturer/vendor checks and responsible-professional verification.
11. Reconcile before returning the draft.
    - Check every request and retained piece against the inventory; check quantities, statuses, exclusions, and sizing arithmetic.
    - Check allowance labels, proportional calculations, reserve treatment, and total reconciliation.
    - Check date subtraction, duration basis, missing quotes, and provisional warnings.
    - Remove invented product identities, prices, ratings, compliance claims, and citations.

## Output format
```markdown
## Design intent
[Use, users/pets, likes, requirements. Excluded per client: …; unresolved conflicts: …]
## FF&E schedule
| Tag | Item | Qty | Target size (calculation if derived) | Material / performance notes (verify) | Budget allowance | Lead-time check / order-by | Status |
|---|---|---|---|---|---|---|---|
| [tag] | [item] | [qty or MISSING] | [size/calculation or MISSING] | [requirements/exclusions] | [amount; allowance — estimate, confirm with quotes; %] | [quoted duration; date/calculation reference or MISSING] | [new / existing-reuse / MISSING] |
## Budget check
Client total: [exact amount/currency]. Scope: [supplied scope and gaps].
[Fixed allocations/reserves; balance; weights; line calculations; percentages; rounding.]
[Item allowances + reserves = total, or unresolved calculation blockers.]
[All allocations are allowances — estimates, confirm with quotes; uncertain cost coverage.]
## Lead-time check
[Quoted durations by tag, basis, conditions, and missing quotes.]
Longest quoted: [tag/duration]. Order-by = [install] − [duration] = [date, or MISSING].
[Buffer calculation, dependencies, provisional warning, and risk flag where applicable.]
## Specs to verify
[By tag: manufacturer evidence for all four categories; nonapplicability reasons for review.]
## Questions for the client
[Client decisions/missing inputs; separately identify vendor and professional checks.]
```

## Hard limits
- Never invent products, names, model numbers, prices, availability, lead times, ratings, statistics, or compliance claims.
- Do not add legal citations, article numbers, named regulators, URLs, or unsupported dates. Supplied project dates and explicitly calculated scheduling dates are permitted.
- No official AI-specific guidance was verified for this profession; check with your licensing body or regulator. No official sources are supplied for citation.
- Fire/flammability codes for furnishings depend on project type and jurisdiction; the designer confirms them.
- A licensed professional where required, or the responsible professional, must verify measurements, fit, circulation, applicable accessibility requirements, manufacturer evidence, budget scope, quotes, and procurement timing.
- UK/AU practitioners must verify local requirements; do not assume US requirements apply.
- Contract and procurement terms are the studio's; do not invent or assume them.
- Never silently omit requests, specify disliked features, or present an incomplete budget/date check as complete.
- Privacy: de-identify briefs, removing names, addresses, access codes, and identifying image metadata; use only studio-approved tools and the minimum necessary information.
- Before issue or procurement, see references/checklist.md.

## Example
Input (fictional):
```text
Sample Room: 12 × 16 ft; requests 1 rug with a 2 ft border on every side.
Keep 1 wood side table, 20 × 20 × 22 in; refinishing quote: 3 calendar weeks to completion.
One dog; likes blue; dislikes velvet. USD 1,200 all-in; allocation weights rug 3, table 1.
Install 2027-03-15; rug quote: 8 calendar weeks from order to delivery. Proceed with gaps flagged.
```
Output (abbreviated):
```markdown
## Design intent
Blue; dog-related cleanability to verify. Excluded per client: velvet.
## FF&E schedule
| Tag | Item | Qty | Target size | Notes (verify) | Budget allowance | Lead-time check / order-by | Status |
|---|---|---|---|---|---|---|---|
| 01 | Rug | 1 | 12−2×2 = 8 ft; 16−2×2 = 12 ft | No velvet; cleanability and slip resistance required | USD 900; allowance — estimate, confirm with quotes; 75% | 8 calendar weeks; provisional 2027-01-18 | new |
| 02 | Wood side table | 1 | 20 × 20 × 22 in supplied | Refinish; cleanable finish required | USD 300; allowance — estimate, confirm with quotes; 25% | 3 calendar weeks; provisional 2027-01-18 | existing-reuse |
## Budget check
USD 1,200 all-in: 1,200×3/4 = 900; 1,200×1/4 = 300; sum = 1,200. Tax/freight/install coverage unconfirmed.
## Lead-time check
01 longest: 8×7 = 56 days; 02: 3×7 = 21 days. Order-by = 2027-03-15 − 56 days = 2027-01-18; provisional pending installation needs and refinishing start conditions.
## Specs to verify
01: manufacturer flammability, abrasion/test method, cleaning guidance/code, slip data. 02: finish cleaning data; furnishing flammability applicability for designer review; upholstery double rubs/cleaning codes and walking-surface slip data appear inapplicable to wood table.
## Questions for the client
Client: project type/jurisdiction, cost coverage, installation needs/buffer? Vendor: refinishing start conditions? Professional: fit, data applicability, and fire requirements?
```

Changelog

  • v1.1 Added FR (France) and PT (Brazil) adaptations to local practice (not a translation): written by claude-opus-5-5, edited by gpt-6-astra, tested on separate pre-written rubrics and inputs: FR Claude Opus 5.5 5 of 5 (3 of 3 runs); FR Claude Sonnet 5 5 of 5 (3 of 3 runs); FR Claude Fable 5.1 5 of 5 (3 of 3 runs); PT Claude Opus 5.5 5 of 5 (3 of 3 runs); PT Claude Sonnet 5 5 of 5 (3 of 3 runs); PT Claude Fable 5.1 5 of 5 (3 of 3 runs); judge gpt-6-astra.
  • v1.1 Revised after the first test round (EN v1.1, ES v1.1): behaviour rules fixed, rewritten by claude-opus-5-5, edited by gpt-6-astra, re-tested on the same pre-written rubric and input. Test: EN Claude Opus 5.5 5 of 5 (3 of 3 runs); EN Claude Sonnet 5 5 of 5 (3 of 3 runs); ES Claude Opus 5.5 5 of 5 (3 of 3 runs); ES Claude Sonnet 5 5 of 5 (3 of 3 runs); judge gpt-6-astra. Added 2026-10-20: Claude Fable 5.1 on the same version, inputs and rubrics: EN 5 of 5 (3 of 3 runs); ES 5 of 5 (3 of 3 runs); judge gpt-6-astra.
  • v1.0 First release. Written by claude-opus-5-5, edited by gpt-6-astra. First test round: EN Claude Opus 5.5 5 of 5 (3 of 3 runs); EN Claude Sonnet 5 5 of 5 (3 of 3 runs); ES Claude Opus 5.5 4 of 5 (3 of 3 runs); ES Claude Sonnet 5 4.7 of 5 (3 of 3 runs).